Skip to content
Monday – Friday: 7 a.m. – 5 p.m.C-15 Roofing and Siding · NV Lic. 000000General liability and workers' compensation
1 more license
  • C-15 Roofing and Siding · NV Lic. 000000
  • General liability and workers' compensation
(775) 555-0100

The one inspection

What we look at in one visit

The visit takes in the roof, the attic and the array together, so you get one report instead of two.

  • The roof surface

    Shingle age, granule loss, cracks, flashing and the edge metal.

  • The deck and attic

    Stains, daylight, moisture and the underside of the deck.

  • Ventilation

    Intake and exhaust, because attic heat shortens a roof's life.

  • Mount points and rafters

    Where the mounts sit now, or where they could go, and the rafter lines under them.

  • Wiring runs and penetrations

    Conduit, vents and pipes the new roof has to flash around.

  • The written options

    Repair or replace, with the roof's remaining life and the photos behind each choice.

Panels already up

Detach and reset, in plain steps

Your solar company's electrician disconnects the array. Our crew does the roof side: panels and racking off, new roof on, mounts flashed, panels back.

We label each string of panels and photograph the layout first, so everything goes back where it was. The electrical work stays with a licensed electrical contractor.

  • Panels labeled and staged on the ground

  • Racking and mounts removed

  • Deck checked where the mounts were

  • Every mount flashed again on the new roof

Two crew members in harnesses tied off with rope set panels on a shingle roof

A sample detach and reset

14 panels off and back on, line by line

This is the roof-side work only, written the way it appears on an estimate.

  • Detach and reset, 14 panels

    One south slope, roof-mounted racking, panels reused.

    • Label, photograph and stage the panels
    • Remove racking and mounts
    • Flash and set mounts on the new roof
    • Reinstall racking and panels

Example only. The electrical disconnect and reconnect is billed by your solar company. Larger arrays, roofs with several slopes and tile roofs change the number.

Questions

Questions homeowners ask

Should I replace the roof before I add solar?

If the roof has under about ten years left, many roofers advise replacing it first, so the panels do not have to come off again. We write the roof's remaining life in the inspection report so you can decide.

Can the panels stay up during a re-roof?

No. The panels and racking come off, the roof is replaced, and the mounts are flashed again before the panels go back. Your solar company's electrician disconnects and reconnects the array.

Do I need a permit?

Almost always for a full replacement. We file the roof permit with the city or county, and the fee is a line on your estimate.

What warranty do I get?

Two parts. The manufacturer's material warranty covers the product, and our workmanship warranty covers our installation. The terms of each, and who registers it, are written on your warranty sheet.

Ready for one inspection of both?

Tell us about the roof and the panels, and we set one visit.