Skip to content
Monday – Friday: 7 a.m. – 5 p.m. · Saturday: 8 a.m. – 12 p.m. · Sunday: ClosedMonday – Friday: 7 a.m. – 5 p.m.C-15 Roofing and Siding · NV Lic. 000000General liability and workers' compensation
1 more license
  • C-15 Roofing and Siding · NV Lic. 000000
  • General liability and workers' compensation
(775) 555-0100

Services

What we do on a roof

Four jobs, each with its own page.

  • Roof and solar, one job

    One inspection, one permit, panels detached and reset, one sheet of warranty dates.

    Roof and solar
  • Roof replacement

    Asphalt and standing-seam metal, torn off to the deck and rebuilt.

    Replacement
  • Roof repair

    Leaks, flashing, vents and mounts, repair first when it is the honest answer.

    Repair
  • Prices and estimates

    What moves the price, a sample estimate line by line and what the visit covers.

    Prices

One job, one calendar

From the first look to the last warranty date

Roof and panels run as one project with one point of contact.

  1. Visit

    Step 1: One inspection

    We walk the ground, the roof, the attic and the array in one visit: shingle age, deck, ventilation, mount points and wiring runs. You keep one set of photos.

  2. Permit

    Step 2: One permit

    We file the roof permit with the city or county, with the mount layout attached. If the array has to be disconnected, your solar company's electrician files that part, and both dates go on one calendar.

  3. Roof

    Step 3: The roof

    Tear-off, deck check, underlayment, edge metal and shingles. Most homes this size take one to three days. Bad deck is priced by the sheet, in writing, before we start.

  4. Panels

    Step 4: The panels

    New mounts go in flashed and laid out with your solar company. If panels are already up, they come off and go back on the new roof, and every mount is flashed again.

  5. Sign-off

    Step 5: The sign-off

    The inspector looks at the roof. We walk the finished roof with you and photograph every flashing.

  6. Warranty

    Step 6: One dated sheet

    When our workmanship warranty starts, when the manufacturer's warranty is registered, and the dates your solar company's own terms begin, all on one page.

Not sure which one you need?

Start with one inspection and we will tell you.